PROJECTS

Administrative

Administrative

Elsewedy Technical academy
“Center of Excellence”

Location: Port-said

Owner: Elsewedy electric

Project Type: Administrative

Consultant: OKO PLAN

Duration : 8 months

Assignment:

Our assignment is all finishing works of area 600 m2 including facades finishes (stone, painting, Aluminum windows and structural glazing), marble pattern flooring, false ceilings , doors, and all roof layers finishes, also all electro-mechanical works (HVAC, electric, plumping)

Elsewedy Technical academy (4).jpg

New El-Marg Metro station

Location : Marg - Cairo

Owner : National authority of tunnels

Project Type : Administration

Consultant : Wassef Design Group

Assignment:

Our assignment was building / finishing works of two technical buildings and exten- sion of platform:

Rectifier station.

Signaling Building.

Platform 2 & 3 extension.

Including the next scope of works: • All Concrete and masonry works.

All types of finishing works including (epoxy flooring, raised floor, gypsum Ceilings, Ceramic, Granite & marble, doors/windows, metals, Painting, Plumbing, Electrical, HVAC Etc...).

Landscape and external works.

Picture1.jpg

Ministry of communications and information technology

Location: Smart Village

Owner: Ministry of communications and information technology

Project Type: Administration

Consultant: ECG

Duration : 10 months

Assignment:

Our assignment was building / finishing works of three main buildings:

• Data center.

•UPS Building.

•Utility building.

Including the next scope of works:

•All Concrete and masonry works.

•All types of finishing works

including (gypsum partitions/Ceilings, glass partitions, Epoxy flooring, raised floor,Ceramic, Granite & marble, doors, metals, Painting, Plumbing, Electrical Etc..)

•Landscape and external works.

WhatsApp Image 2022-09-26 at 12.37.12 PM (2).jpeg

UIC Factory

Location: 10th Ramadan

Owner: Elsewedy Cables

Project Type: Administration

Consultant : SA Architects

Duration : 10 months

Assignment:

Our assignment is all Renovation works of Admin building and all construction and finishing works of area 410 m2 of Locker building including facades finishes (stone, painting, Aluminum windows and structural glazing), marble pattern flooring, false ceilings, doors, and all roof layers finishes, also all electro-mechanical works (HVAC, electric, plumping)

IMG_20240325_125802.jpg

BUS-WAY FACTORY Admin Building 

Location: 10TH RAMADAN

Owner: Elsewedy electric

Project Type: Administrative

Consultant: Sets north africa

Duration : 8 months

Assignment:

Our assignment is construction and finishing works of area 1200 m2 including facades finishes (stone, painting, Aluminum windows and structural glazing), marble pattern flooring, false ceilings , doors, and all roof layers finishes, also all electro-mechanical works (HVAC, electric, plumping

BUS-WAY FACTORY Admin Building (1).jpg

Port Said Technical School (Zohr)

Location: Port-said

Owner: STA

Project Type: Administrative

Consultant: ECG

Duration : 6 months

Assignment:

Our assignment is all Renovation works of 3 building including facades finishes (stone, painting, Aluminum windows and structural glazing), marble pattern flooring, false ceilings , doors, and all roof layers finishes, also all electro-mechanical works (HVAC, electric, plumping) and fence and land scape with playgrounds.

Port Said Technical School (Zohr) (8).jpg

Arab Investment Bank

Location : Down Town - Cairo

Owner : Arab Investment

project type : Administrative
Consultant : ECG

Assignment:

Our assignment is renovate the data center floor for Arab investment bank as the following: finishes and all MEP works of one floor of 1200 m raised flooring, ceilings (wood, gypsum, etc.), doors, also all electro-mechanical works (HVAC, electric fire alarm, fire fighting, plumbing, telephone and data) .

Arab Investment Bank (6).jpg

Summits International schools

Location: A-Meraaj - New Maadi

Owner: Summits

Project Type: School

Consultant:  Dr. Bhaa Mahmoud

Duration: 10 Month

Assignment:

Our assignment is all finishing works of five typical floors of area 6500 m2 including facades finishes (stone, painting, Aluminum windows and structural glazing), marble pattern flooring, false ceilings , doors, and all roof layers finishes, also all electro-mechanical works (HVAC, electric, plumping)

Summit International shcools (3).jpg

MCIT DATA CENTER

Location : Smart Village

Owner : Ministry of communications & information technology

Project Type : Administration
Consultant : ECG

Assignment:

Our assignment was building / finishing works of three main buildings:

• Data center.

UPS Building.

•Utility building.

Including the next scope of works:

•All Concrete and masonry works.

• All types of finishing works including (gypsum partitions/Ceilings, glass partitions, Epoxy flooring, raised floor, Ceramic, Granite & marble, doors, metals, Painting, Plumbing, Electrical Etc...)

• Landscape and external works.

WhatsApp Image 2022-09-26 at 12.37.04 PM (2).jpeg

MIST Headquarters

Location : Smart Village

Owner : MIST

Project Type : Administration
Consultant : ECG

Assignment:

Our assignment was all finishing works of the first floor of 250 m2, gypsum partitions , glass partitions, carpet tiles, ceilings (wood, gypsum, etc.), doors,, also all electro- mechanical works (HVAC, electric, fire alarm, fire fighting, plumbing, telephone and data) the specs of the work are according to the standard specs of the Smart village company.

100_3048.JPG
Industry

Industry

Iskraemeco Factory

Location: 10th Ramadan

Owner: Elsewedy electric

Project Type: Industry 

Consultant: RMC

Duration : 3 months

Assignment:

Our assignment is all repairing and retrofitting works for industry zone and returning the factory to its original state while continuing the work during the repairing process.

Iskraemeco (6).jpg

VINAVIL-EGYPT
Acrylic Emulsion Factory

Location : Suez - Egypt

Owner : Vinaval Egypt

project type : Industry

Consultant : ECG

Assignment:

Demolishing the administration building, underground water tank, electrical room, security room and fences .

Site grading of the new purchased land including cut and fill .

all above packages includes all type of works Architectural, Structural, Electrical ,Light current, Plumbing & Fire-fighting ,Grading, Infrastructure and piping .

Construction of 300 M. concrete fence, steel gate and guard room .

Construction of an underground tunnel between Vinavil East side part of factory and Vinavil west side part of factory crossing the external main road. Work includes excavation in the road between the two parts of vinavil factory, laying of external protecting carbon steel pipes fully assembled with the internal stainless steel AISI 316 process pipes.

VINAVIL Factory - SUEZ (8).jpg

COCACOLA Factory
Power Station

Location : Free Zone - Cairo

Owner : Coca Cola Egypt

project type : Industry
Consultant : Cairo Consult

Assignment: 

All packages including Civil, Architectural, steel structure works, Electrical power supply, Light current, Plumbing, Fire-Fighting, HVAC and connecting to existing networks .

Coca-Cola Factory Power station- Free zone (7).jpg

LESAFFRE-EGYPT
Yeast Factory

Location : Nubara– Alex Road

Owner : lessaffre

Project Type : Industry

Consultant : ECG

Assignment:

New water treatment 4000 m2 plant including concrete, insulation, finishes and mechanical fixations.

 Loading platformincluding Steelstructure, metal cladding, dock leveler and all relevant civil works.

All concrete works for chemical and yeast tanks foundations and production area slab on grade

including surface chemical flooring finishes.

 All flooring types including (Heavy duty ceramic, epoxy, U-Crete,paving, interlock and etc).

 Cooling units for cold stores.

Fence and landscaping.

Drainage stainless steel piping and trenches network for all the factory

areas.

images.jpg
pharmaceutical

Pharmaceutical 

Abo Al-Rish Children's Hospital renovations

Location : Cairo

Owner : Abo Alrish

Project type : pharmaceutical
Consultant : Dr. Hmam

Assignment : 

Renovation of existing 8 floors including the main ICU floor and New Born Unit Floor for the next works :

All types of finishing works including (PVC wall cladding, vinyl floorings, Acoustical ceilings, Stainless steel doors, wood, glass, porcelain and ceramic tiles, epoxy, Aluminum windows, curtains and marble, etc.)

All electromechanical works including Electrical, medical gasses fire alarm, CCTV, Plumbing, Fire  fighting and HVAC works .

Replacing all the sewage and water supply networks and toilets .

Abo Al-Rish Children_s Hospital renovations (9).jpg

IDH Headquarters
(Al-Mokhtabar)

Location : Smart Village – Cairo

Owner : IDH Group

Project Type :pharmaceutical
Consultant : ECG

Assignment:

Our assignment was structure modifications and finishing works of 6 floors including two basements, with total built up area 12000 M2 as well as IDH central Data center in the 1st basement. Including the next scope of works:

Construct a new stair for the building, strengthen works for concrete elements and steel structure works on the roof.

All types of finishing works including (concrete floors, gypsum partitions /Ceilings,

glass partitions, carpet tiles, Raised floor, vinyl, doors, Metals Granite & marble, Epoxy, Painting, Etc...)

 All electromechanical works (HVAC, electric, fire alarm, firefighting, plumb- ing, telephone and data, CCTV System) the specs of the work are according to the standard specs of the Smart village and ECG.

Landscape and external works around building with 10000 m2.